Search

Home / OHOB-COOL / Replacement Parts
14 Inch Universal Automotive Electric Radiator Fan Cooling Slim Fans 17V Pull Wide S-Curved Blade DC+ Mounting Kit in Kuwait 14 Inch Universal Automotive Electric Radiator Fan Cooling Slim Fans 17V Pull Wide S-Curved Blade DC+ Mounting Kit in Kuwait 14 Inch Universal Automotive Electric Radiator Fan Cooling Slim Fans 17V Pull Wide S-Curved Blade DC+ Mounting Kit in Kuwait 14 Inch Universal Automotive Electric Radiator Fan Cooling Slim Fans 17V Pull Wide S-Curved Blade DC+ Mounting Kit in Kuwait 14 Inch Universal Automotive Electric Radiator Fan Cooling Slim Fans 17V Pull Wide S-Curved Blade DC+ Mounting Kit in Kuwait 14 Inch Universal Automotive Electric Radiator Fan Cooling Slim Fans 17V Pull Wide S-Curved Blade DC+ Mounting Kit in Kuwait 14 Inch Universal Automotive Electric Radiator Fan Cooling Slim Fans 17V Pull Wide S-Curved Blade DC+ Mounting Kit in Kuwait 14 Inch Universal Automotive Electric Radiator Fan Cooling Slim Fans 17V Pull Wide S-Curved Blade DC+ Mounting Kit in Kuwait

14 Inch Universal Automotive Electric Radiator Fan Cooling Slim Fans 17V Pull Wide S-Curved Blade DC+ Mounting Kit

KWD 12

Brand
OHOB-COOL
1 +

Special Features

  • Technical Data: 14" Cooling Radiator Fan, Cfm:2000,12 Volt,Current:5-7A
  • Watts:80w ,Nylon tie mounting kit included Blade
  • Ultra-thin design to fit cramped locations. Reinforced glass filled polypropylene blade ,Ensure that the engine does not fail due to excessive temperature

Related Items


{"error":"Error","cart_limit":"You have too many items in your cart.","prod_limit":"You cannot add any more of this item"}