Search

Home / TLD / Sports Shirts & Polos
Troy Lee Designs Youth Flowline Tripper Black LS Jersey size Large in Kuwait Troy Lee Designs Youth Flowline Tripper Black LS Jersey size Large in Kuwait

Troy Lee Designs Youth Flowline Tripper Black LS Jersey size Large

KWD 8.500

Brand
TLD
– 1 +

Special Features

  • Jersey
  • Pull On closure
  • Machine Wash

Description

Troy Lee Designs Youth Flowline Long Sleeve Jersey Description:
With a casual fit, and technical fabrics the Troy Lee Designs Youth Flowline Long Sleeve Jersey allows young riders to tackle any trail with confidence. The quick-drying fabric helps cool in the warmest of conditions while providing protection from the sun. Inspired by TLD racing background, built for everyday fun.

Features: TLD Dura Knit fabric
Wicking & quick dry finishes
Fabric is certified Bluesign approved
Ride Fit allows for freedom of movement on the bike

Specifications: Gender: Youth & Kids
Manufacturer Fit: Standard
Fabric: TLD Dura Knit
SPF/UPF: -
Zipper: None
Pockets: -
Sleeve Length: Long Sleeve
Color: Black

Related Items


{"error":"Error","cart_limit":"You have too many items in your cart.","prod_limit":"You cannot add any more of this item"}